Le 29 octobre 2026, l’exploitant de la centrale nucléaire de Chooz B a déclaré à l’ASNR un évènement significatif pour la sûreté relatif au dépassement du délai de réparation d’un groupe froid associé au système de ventilation de la salle de commande du réacteur 2 prescrit par les règles générales d’exploitation.
Le 30 octobre 2026, EDF a déclaré à l’Autorité de sureté nucléaire et de radioprotection (ASNR) un événement significatif pour la sûreté relatif à la sortie du domaine de fonctionnement autorisé par les règles générales d’exploitation du réacteur 4 de la centrale nucléaire de Paluel.
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a…
The U.S. Nuclear Regulatory Commission (NRC) is providing public notice of receipt and availability each week, for four consecutive weeks, beginning November 10, 2026, of the second part of a phased construction permit application, from SMR, LLC, on behalf of Palisades SMR, LLC, a wholly-owned subsidiary of Holtec International, for a dual-unit SMR-300 plant located at the Palisades Energy Center (PEC) in Covert, Michigan. The units are individually named Pioneer Unit 1 and Pioneer Unit 2. This is the first of four consecutive weekly notifications. The application for the construction permits…
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-6, issued to Entergy Operations, Inc. (Entergy, the licensee), for operation of Arkansas Nuclear One, Unit 2 (ANO-2). The proposed amendment would revise the technical specifications (TSs) for ANO-2, by modifying the note associated with Surveillance Requirement (SR) 4.1.3.1.2 to permit Control Element Assembly (CEA) 29 to be excluded from exercising for the remainder of Cycle 32. This change would allow CEA 29 to remain out of the exercising…