Skip to content
Nupdate
Source: Federal Register - Nuclear Regulatory Commission

Entergy Operations Inc.; Arkansas Nuclear One, Unit 2; License Amendment Application

The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-6, issued to Entergy Operations, Inc. (Entergy, the licensee), for operation of Arkansas Nuclear One, Unit 2 (ANO-2). The proposed amendment would revise the technical specifications (TSs) for ANO-2, by modifying the note associated with Surveillance Requirement (SR) 4.1.3.1.2 to permit Control Element Assembly (CEA) 29 to be excluded from exercising for the remainder of Cycle 32. This change would allow CEA 29 to remain out of the exercising…

Text analysis

Computed from the title and excerpt shown here, by fixed rules (no AI). Scores are only given for English text of enough length.

Tone
Positive3 positive and 0 negative words
Reading level
Difficult

Long sentences or technical words. Expect to read it twice. Flesch score 25, about US grade 16.

Length
105 words, 4 sentences, 26.3 words per sentence
Word difficulty
38% long words (7+ letters), 5.2 letters on average

Reading aids

Entergy Operations Inc.; Arkansas Nuclear One, Unit 2; License Amendment Application

The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-6, issued to Entergy Operations, Inc. (Entergy, the licensee), for operation of Arkansas Nuclear One, Unit 2 (ANO-2). The proposed amendment would revise the technical specifications (TSs) for ANO-2, by modifying the note associated with Surveillance Requirement (SR) 4.1.3.1.2 to permit Control Element Assembly (CEA) 29 to be excluded from exercising for the remainder of Cycle 32. This change would allow CEA 29 to remain out of the exercising…

How this was classified

Rule-based suggestions with their evidence. Anything marked low confidence is not confirmed.

  • Regulationrule match · 74% · keyword:"licen*" (title) +2 more
  • Regulatory developmentlow confidence · 30% · source-type:regulator

Nupdate shows a short feed excerpt only. Read the full publication at the original source (Federal Register - Nuclear Regulatory Commission), published 6 Nov 2026.