Skip to content
Nupdate

Language

Language analysis

How the sector writes: tone, reading difficulty, the words that set one country, topic or organisation apart, and the words that travel together. All figures come from fixed linguistic rules over titles and excerpts, not from AI.

Tone and readability

927 articles analysed, 452 in English (the only language scored). Average Flesch score 27 (US grade 14), 17 words per sentence. Average sentiment +0.17 on a scale of −1 to +1.

Tone

  • Positive233 (52%)
  • Neutral152 (34%)
  • Negative39 (9%)
  • Mixed28 (6%)

Reading level

  • Very difficult155 (37%)
  • Difficult152 (37%)
  • Standard82 (20%)
  • Easy23 (6%)
  • Very easy2 (0%)

Language of the text

  • English452 (49%)
  • Dutch277 (30%)
  • French142 (15%)
  • Undetermined (too short)56 (6%)

Most feeds are official notices, so a positive tone often reflects words like “approved” or “licence” in routine regulatory announcements rather than good news. Read it as a signal of wording, not of events.

Distinctive words

Choose a country, topic or organisation above to see the words and phrases it uses far more than everyone else.

Word neighbours

“begin long-lead” appears in 1 articles. PMI shows how much more often than chance each word shares an article with it (higher = tighter bond; 0 = no association).

No word shares at least two articles with it yet.

Method